FENCO NOISE ABSORPTIVE BARRIER

Demonstration Panel – Fenco Noise Absorptive CLOSE UP

 

Fenco Noise Absorptive Panels were chosen for the Power Stations
at Mullumbimby & Tumbulgum (NSW) and completed in Sept 2000

 

Electrical Transformer yard, Redcliffs near Mildura, Victoria

 

Current Project – Jet engine run up at RAAF Base
Fenco Noise Absorptive Barrier being constructed on top of existing
Noise Mound required the innovative use of a purpose built
Work Platform from which to bore the piers.

 

Jet Engine Run-up Facility at RAAF Base Amberley.
FENCO Absorptive Noise Barriers 4 metres high on top of 4 metre high concrete and soil Bund

 

Jet Engine Run-up Facility at RAAF Base Amberley.
Excavator working on Elevated Platform ( designed and constructed by Fenco),
boring piers for FENCO Absorptive Noise Barrier

 

F111 in position for Jet Engine Run-up at RAAF Base, Amberley, Queensland